投稿专栏
您现在的位置:首页
实验室装修讲解钢木实验台的安装
2015年09月11日
来源:
作者:上海天翎净化实验室
责任编辑:admin
摘要:实验室装修讲解钢木实验台的安装
专业实验室设计、一流实验室设计施工、上海专业实验室、实验室装修公司、专业实验室设计专家
Laboratory renovation on experimental installation of steel and wood
第一步:观察钢架的正,侧面,在钢架上标出柜体的高度或做一个与柜高度相同的靠栅。
The first step: positive, sides of the steel frame, steel frame out in cabinet height or do a highly identical with the cabinet by the gate.
第二步:按照实验台的总长度,选择出相合适的横梁,用自钻螺丝把横梁固定到钢架上
The second step: in accordance with the total length of experimental
select suitable for the beam, the beam self drilling screws fixed to the steel frame.
第三步:用水平尺检查钢架的横﹑纵线,是否水平实验室装修
The third step: the transverse, longitudinal level check steel frame, whether level
第四步:在确保水平的前提下,方可挂吊柜体。
The fourth step: to ensure the level of the premise, can be hanging cabinet.
第五步:把装好滑轨的抽屉填进柜体,在抽屉上4mm麻花钻头顶打四只孔
The fifth step: loaded sliding rail drawer filled into the cabinet, drill 4mm Hemp flowers on the drawer head playing four holes
第六步:黏结台面的步骤﹑要求与全钢一样。钢木结构通常先装抽面,后安装台面,若台面上有试剂架安装,待胶固化后再行安装操作。实验室装修
The sixth step: bonding mesa steps, requirements and all steel. Steel and wood structure is usually installed in the first pumping surface, after the installation of mesa, if the table has the reagent frame installation, after the glue curing after installation and operation.
实验室装修讲解钢木实验台的安装
专业实验室设计、一流实验室设计施工、上海专业实验室、实验室装修公司、专业实验室设计专家
Laboratory renovation on experimental installation of steel and wood
第一步:观察钢架的正,侧面,在钢架上标出柜体的高度或做一个与柜高度相同的靠栅。
The first step: positive, sides of the steel frame, steel frame out in cabinet height or do a highly identical with the cabinet by the gate.
第二步:按照实验台的总长度,选择出相合适的横梁,用自钻螺丝把横梁固定到钢架上
The second step: in accordance with the total length of experimental
select suitable for the beam, the beam self drilling screws fixed to the steel frame.
第三步:用水平尺检查钢架的横﹑纵线,是否水平实验室装修
The third step: the transverse, longitudinal level check steel frame, whether level
第四步:在确保水平的前提下,方可挂吊柜体。
The fourth step: to ensure the level of the premise, can be hanging cabinet.
第五步:把装好滑轨的抽屉填进柜体,在抽屉上4mm麻花钻头顶打四只孔
The fifth step: loaded sliding rail drawer filled into the cabinet, drill 4mm Hemp flowers on the drawer head playing four holes
第六步:黏结台面的步骤﹑要求与全钢一样。钢木结构通常先装抽面,后安装台面,若台面上有试剂架安装,待胶固化后再行安装操作。实验室装修
The sixth step: bonding mesa steps, requirements and all steel. Steel and wood structure is usually installed in the first pumping surface, after the installation of mesa, if the table has the reagent frame installation, after the glue curing after installation and operation.
上一篇:实验室装修讲解实验室试剂柜的特点[ 09-10 ]
下一篇:条件性恐惧实验、场景恐惧实验、Fcs实验[ 09-17 ]
编辑信箱
欢迎您推荐或发布各类关于实验动物行业资讯、研究进展、前沿技术、学术热点、产品宣传与产业资源推广、产业分析内容以及相关评论、专题、采访、约稿等。
我要分享 >对不起,暂无资料。
热点资讯
- 年
- 月
- 周